Bill the QTO Schedule into the open Workbook in one go: each line by its ANZSMM code, under its AIQS element, trade and item.
In 1 Cost Planning and Estimates, Auto-bill is grey: it bills to ANZSMM, which is BQ work (Service 2 BQ). Its tip says so; to bill, change the Service in Project Setting.
To auto-bill
- Open the Workbook to bill into (Workbook).
- Click 2D tab › Output panel › Auto-bill.
The Auto-bill panel lists the elements that have lines to bill. - Under To bill — tick the elements, tick the elements this Workbook covers. Select All and Clear All tick or clear them all. Your ticks are kept with this Workbook.
- Click Auto-bill.
Each QTO Schedule line is billed by the ANZSMM code in its Folder column. A 2D line takes the item code of its Dimension Group.
Lines that are not billed
The panel says why, for each one:
| Reason | What to do |
|---|---|
| No code yet | Type a code in the line’s Folder cell, or give its Dimension Group an ANZSMM item code. |
| Folder is not an ANZSMM code | Correct the Folder. |
| No AIQS element yet | The line has a trade but no element. Bill it by hand. |
| Not ticked in Run QTO | Tick it in Run QTO and run again. |
Run it again
After a revision, run Auto-bill again. It adds what is new and keeps everything you typed.
- Not applicable to this Workbook: for a Workbook you build by hand, such as a package. Auto-bill then bills nothing into it until you untick this.
- House style: underlines the heading directly above each item with a quantity, at every Auto-bill.
If you are editing the Workbook’s Auto structure, finish it first (✓ Done), then Auto-bill.
Previous: Workbook · Next: Export Report
