Project Setting

Help

State the basis the project is measured on: is the BIM model part of your service agreement, and so where are the quantities taken from.

Every project has a Project Setting. It is saved with the project and printed on the certificate and the BQ. A new project opens it straight away, and you can open it again at any time.

To set up a project

  1. Click Manage tab › Manage Project panel › Project Setting, as Revit’s Project Information.
    A click on the Service in the middle of the top bar opens it too. When you start a new project, it opens by itself.
  2. On the Basis tab, answer Is the BIM model part of your service agreement?
    • Yes: the model is a contract deliverable. Choose the Platform (Revit, ArchiCAD, Tekla, or IFC from other software). The quantities are taken from the model.
    • No: the model is for information only. The quantities are taken from the drawings.
    The line under the question shows the result, for example Quantities: from the drawings.
  3. On the Services tab, answer Which Service are you starting? It is required: pick one. QSKing 5D is arranged around the four Services of Cost Management, in order:
    ServiceNow
    1 Cost Planning and EstimatesBuilt
    2 BQBuilt
    3 Valuation and VariationGrey: coming, not built yet
    4 Final AccountGrey: coming, not built yet
    For each Service you can also tick In appointment and give its Budget hours; both are optional. The Service shows in the middle of the top bar, on blue (for example 2 BQ). Click it to open Project Setting and change the Service.
  4. On the Project tab, fill in the Project Name, Project No. and Location (all three are required, marked *), and the Notes (the client, and anything else about the project). With Yes, also the Model source (who made the model, and which issue) and the Model status. The Home page’s card for the project shows its Project Name, Project No. and Service.
  5. Click OK.
    QSKing 5D opens the tab that fits the answer: the 2D tab when the drawings govern, the 3D tab when the model governs.

What the Service changes

  • In 1 Cost Planning and Estimates, Area ▾ is live, so the GFA can be measured, and Export Report’s icon exports a Cost Plan. Auto-bill is grey: it bills to ANZSMM, which is BQ work.
  • In 2 BQ, Auto-bill is live, Area ▾ is grey, and Export Report’s icon exports the BQ.
A tab with something still to answer shows a *: Basis * until the question is answered, Services * until a Service is picked. Project Setting opens on the first tab with something to answer. OK stays refused until the Basis question is answered, a Service is picked, and Project Name, Project No. and Location are filled in; it goes to the tab with what is missing and says what. On a new project, Cancel makes no project and goes back to Home.

To take the quantities from somewhere else

Most projects need only the one answer. When a part of the job is measured from the other source, click Change… beside the quantities line:

Quantities taken fromMeans
The model governs2D is used only for work that is not modelled.
Drawings governThe model is an aid and a check.
Model and drawings complement each otherWork is measured from whichever shows it, and both are billed.
  • Decided by: your name. It is recorded with the date, under the quantities line.
  • Except for: pick an Element or a Trade and the other source, then Add. For example: the model governs, except SB Substructure from the drawings.

A project saved before release 1.0.23

A project with no complete Project Setting still opens. QSKing 5D asks once whether to open Project Setting now. If you say No, measuring works as before, but the BQ and the certificate cannot be issued until Quantities taken from is chosen.

Next: Drawing Register to add the drawings.
The answer follows the AIQS/NZIQS BIM Best Practice Guidelines (s. 2.1 and 6.2).